Mighty Squirrel Brewing Co.
Tenant improvement projects executed with a primary focus on high-volume craft beer manufacturing and industrial process integration. The scope of work included the design and installation of steam and process piping systems to support large-scale brewing operations. Major equipment installations consisted of brewhouses, grain silos, fermentation tanks, and industrial chillers, all of which required precise coordination and sequencing. The project incorporated heavy structural steel framing and support systems to accommodate significant equipment loads and operational demands. The total constructed area spanned approximately 40,000 square feet across three separate locations. Mighty Squirrel’s Waltham manufacturing facility is designed to produce up to 20,000 barrels of beer annually, representing approximately 7 million individual beers.
Project Highlights
- › 40-foot custom fabricated bar with integrated tap system for 36 beers
- › Structural steel mezzanine with capacity for 80 guests
- › Retractable garage door facade opening to Brookline Avenue
- › All work completed within a 14-week construction window
Trade Partners
- Phase Zero Design
Gallery
“They understood the vibe we were going for from day one. The bar came out exactly as we envisioned — and they hit every milestone on the schedule.”
Aaron Cohen
Co-Founder, Mighty Squirrel Brewing Co.
